Proponent: Exploits Valley Renewable Energy Corporation (EVREC)
Summary of Environmental Assessment Process
Project Description:
The Proponent is proposing to construct and operate a 3.5 gigawatt (GW) onshore wind energy project consisting of three wind farms with up to 530 turbines in the Central Newfoundland area, and a 150-megawatt solar farm and a 2.6 GW hydrogen/ammonia production facility in Botwood.
- October 7, 2024 – The undertaking was registered.
- November 11, 2024 – Deadline for public comments.
- November 21, 2024 – The Minister’s decision is due.
- Documents:
- Registration Document (3 MB)
- Appendix A – Drawings 1.1-3.8 (20 MB)
- Appendix A – Drawings 3.9-3.22 (16 MB)
- Appendices B – F (5 MB)
- Appendix B – CO2 Summary From EVREC
- Appendix C – Atlantic Canada Conservation Data Centre (ACCDC) Report
- Appendix D – Archaeology Report
- Appendix E – Public Meetings/Information Sessions
- Appendix F – Environmental Protection Plan (EPP) Table of Contents
- Registration Document (3 MB)
- Public Notices:
- Project Registered (85 KB)